Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/freshair/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ajax-load-more domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/freshair/wp-includes/functions.php on line 6121
Brf Björkallen | Fresh Air

Brf Björkallen

Beställare:
Besqab

Entreprenadstart:
2018

Inflytt:
2019

Nybyggnation av 85st lägenheter i Ultuna Uppsala Fresh Air har utfört ventilationsentreprenaden

Fler refenser

Kv Ivar

Kv Ivar

Beställare: Byggconstruct Entreprenadstart: 2023 Inflytt: 2024-2025 Totalrenovering 100 st lägenheter i Västerås, Fresh Air har utfört ventilationsentreprenaden på totalentreprenad. Västerås - Centrala

läs mer
Lindallen

Lindallen

Beställare: Besqab Entreprenadstart: 2021 Inflytt: 2023 Nybyggnation av 253st lägenheter i Ultuna Uppsala Fresh Air har utfört ventilationsentreprenaden. Plats: Ultuna Uppsala

läs mer
Brf Arboristen

Brf Arboristen

Beställare: Besqab Entreprenadstart: 2021 Inflytt: 2022 Nybyggnation av 90st lägenheter i Ultuna Uppsala Fresh Air har utfört ventilationsentreprenaden. Plats: Uppsala

läs mer