Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/freshair/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ajax-load-more domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/freshair/wp-includes/functions.php on line 6121
Universitetsaulan | Fresh Air

Universitetsaulan

Uppdragsgivare:
IR Bygg

Fastighetsägare:
Statens Fastighetsverk.

Brukare:
Uppsala Universitet

Utförandeentreprenad i samverkan:
Luftbehandling och Kyla.

Omfattning:
Varsamt renoverat stora delar av hela Universitets Aulan. Nya ventilationsaggregat, fläktar samt installationer i lärosalar, hörsalar och kontor.

Fler refenser

Kv Ivar

Kv Ivar

Beställare: Byggconstruct Entreprenadstart: 2023 Inflytt: 2024-2025 Totalrenovering 100 st lägenheter i Västerås, Fresh Air har utfört ventilationsentreprenaden på totalentreprenad. Västerås - Centrala

läs mer
Brf Björkallen

Brf Björkallen

Beställare: Besqab Entreprenadstart: 2018 Inflytt: 2019 Nybyggnation av 85st lägenheter i Ultuna Uppsala Fresh Air har utfört ventilationsentreprenaden

läs mer
Lindallen

Lindallen

Beställare: Besqab Entreprenadstart: 2021 Inflytt: 2023 Nybyggnation av 253st lägenheter i Ultuna Uppsala Fresh Air har utfört ventilationsentreprenaden. Plats: Ultuna Uppsala

läs mer